Paulding County Sheriff’s Training Center Pump Station

Paulding County Sheriff’s Training Center Pump Station

IMG_0787-300x225Southern Associates is pleased to announce that it has has recently completed the Paulding County Sheriff’s Training Center Pump Station project. Before installation could be begin, the site had to be excavated to fit the 10′ diameter by 22.5′ deep precast concrete wet well. Once the pit was excavated, a mobile 160 ton crane was used to set the precast 10′ diameter wet well sections.
After the well was installed, the Smith & Loveless packaged pump station was placed on top of the well. Then the electrical conduits were buried and the pump station pad was prepped for the security fence installation and pouring of the 55’x55′ reinforced concrete pad. While the soon-to-be-installed generator was in transit, the security fence and concrete pad were completed. The Generac 150 kW generator was specified with a Class 2 sound proof enclosure because there will be office buildings located close to the pump station.

About Southern Associates:
Southern Associates also provides water and sewer engineering and water and sewer utility construction. SAE specializes in the design, construction, and repair of municipal water and sewer lift stations as well as package waste water treatment plants. Southern Associates was incorporated in September 2003 by Steven Dalton. Steven Dalton is the president of the company, he also continues to serve as a Pump Station Design Engineer, Sewer Pump Station Service Engineer and a Licensed Utility Manager.

About the author

admin administrator